Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 356 decisions within 5 km, 2 exact-site or onsite candidate records, and 25 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
25 structured nearby appeal records.
25 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(i) Construction of a Stationary Battery Energy Storage Facility which includes eighteen 20ft containers and five medium voltage transformers, (ii) Construction of a single storey substation building along with a GRP kiosk and an acoustic fence and (iii) All associated site and development works
The development of a battery energy storage system (BESS) within a total site area of up to 0.41 hectares, to include 1 no. single storey electrical substation building, 1 no. customer switchgear container, 9 no. electrical inverter/transformer station modules (SKIDS), 6 no. containerised battery storage modules on concrete support structures, 12 no. heating, ventilation and air conditioning units (HVAC units), access tracks and upgraded site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV security monitoring system, landscaping works and all associated ancillary infrastructure on land
For a 25 year permission for a solar farm up to 19 Ha with an export capacity of approximately 9MW comprising of photovoltaic panels on ground mounted steel frames, a single storey DNO building, customer room, control building, storage container, HV kiosk, switch gear housing and 6 no. inverter transformer enclosures, ducting and electrical cabling, perimeter fencing, mounted CCTV cameras, new internal access tracks and associated drainage infrastructure and all associated site works at Ballkenny, Co Longford. Please Note: this site is adjacent to the existing ESB Richmond Electricity Substation. A Natura Impact Statement will be submitted to the planning authority with the planning application. The Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy, during office hours at the offices of the Planning Authority
Construction of a silage pit with retaining walls and concrete apron together with the proposed construction of a meal storage shed together with roofing of an existing silage pit and all ancillary site works
Proposed construction of a bungalow type dwelling house with attached garage, entrance, boundary fence/wall suitable sewerage system with percolation area and all ancillary works
Proposed construction of a bungalow type dwelling house, detached garage, entrance boundary fence/wall, onsite suitable treatment system with percolation area & ancillary site works
The brief summarizes the pattern across all 356 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18157The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief