Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 376 decisions within 5 km, 7 exact-site or onsite candidate records, and 25 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
25 structured nearby appeal records.
25 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A)The construction of two no ground floor, single storey glass extensions with solid roof to existing courtyard area for ancillary use to the hotel. One extension will be located off the existing main function room and the other extension will be located off the existing bar/lounge area (the works involve new ground floor openings in existing structure linking the existing bar and function room to the new extensions) b) Removal of the existing bar in the existing bar/lounge and the demolition of the existing internal walls of the existing adjoining kitchen and keg store (former Sacristy) to allow a new bar area to be constructed to serve the existing bar/lounge area. c) Demolition of internal walls of the ground floor comms room and office space on the ground floor lobby to create an open lobby space. d) Modifications to the existing gents toilets off the main reception to aid works described in item C above. e) Demolition of internal walls of ground floor meeting room 1 to make meeting room 1 larger. f) Installing remotely operated electronic security gates (vehicle and pedestrian gates) and security fence on internal approach road to the hotel g) Install a new remotely operated electronic pedestrian gate to the south east boundary h) Creation of a large wedding suite (by combining existing bedrooms 107 and 108 to create one room) on the first floor with access to a new small enclosed roof garden. i) A new free standing sign to replace the existing vandalised sign. New sign is 5m wide by 4m high and is located at the junction of the public road and the access road to the development and all associated site works. The building is a protected structure under the Athy Development plan 2012-2018 (ref AY-038, AY-040, AY-041, NIAH Ref 1150519, 1150520 and 1150517) at former convent lands and premises formerly known as the Carlton Abbey Hotel
2no. first floor two bed apartments and all ancillary site development works including provision of new accessible entrance ramp & stairs, erection of new weld mesh fencing with pedestrian gate, new dado wall with metal railing over to match existing at car parking area, revisions to front boundary fence including provision of pedestrian gateway, new external bin store and new external bicycle store
(a) Accessible ramp to the front of existing church; (b) Change existing store to an accessible WC; (c) Internal ramp to the altar; (d) Alterations to side altars to accommodate two new store rooms, all at St. Michael's Roman Catholic Church which is a protected structure (RPS AY042)
For change of use to a parish centre (St. Michael’s), alterations to the vehicular entrance, boundary wall and car parking arrangements; internal alterations and layout changes, new access ramp, external signage and the provision of all associated site development works. Revised by Significant Further Information of revisions to the site boundary to exclude the existing tree and ramp, and alterations to the proposed parking layout.
Single storey extension to existing shop to side including alterations to shop front to provide new window, provision of stone cladding to front elevation of shopfront at ground floor, retention of 2 No. single storey canopy structures to rear of shop, retention of side extension to shop, retention of new service yard gateway to existing car parking area, and all ancillary site development works
The partial retention of the existing gaming and amusement arcade use and its relocation to the rear of the building at the Former Hibernian Bank [Protected Structure, RPS ref. AY036], 46 Leinster Street, Athy, Co.Kildare. The proposed development consists of or comprises the carrying out of works to a protected structure
The brief summarizes the pattern across all 376 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18240The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief