Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 177 decisions within 5 km, 5 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For revisions to previously granted planning reference number 18/325. Revisions are to proposed extension only and consent of increase to granted extension floor area from 672m2 to 783m2, east elevation wall and w.c. facilities to be moved in an eastern direction to accommodate increase in floor area, minor external alterations to elevations and all associated landscaping and ancillary site works
Retention planning permission consists of: (a) Retention for change of use of previous agricultural land (1.453 hectares) to existing industrial use, which contains existing as built entrance with gate and splayed wing walls, existing industrial unit 01(1058.5m2), existing industrial unit 02(808m2), existing industrial unit 03(83.5m2), existing portacabin office (14m2), existing portacabin canteen (17m2), existing power supply building (6m2), existing concrete hardstanding areas, existing hardcore/gravel hardstanding areas, existing mature screening/landscaping areas and all ancillary site works, and planning permission for: (b) a proposed industrial unit extension (672m2) with adjoining w.c facilities to the south elevation of existing industrial unit, (c) a proposed waste water treatment system, (d) proposed hard-core/gravel hardstanding areas, (e) all associated landscaping and all ancillary site works.
Construction of a single storey industrial unit extension to the side of existing unit and all ancillary site development works
Is sought for the construction of an industrial unit extension to the side of existing unit and all ancillary site development works
The demolition of the existing entrance porch to a single-storey dwelling and the construction of a new relocated entrance porch, with all associated works
The demolition of existing outbuildings, alterations and construction of a single-storey extension to an existing single-storey dwelling house, a detached domestic garage, landscaping, boundary treatments and all associated works to facilitate the development
The brief summarizes the pattern across all 177 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18325The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief