Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 124 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A TWO STOREY PRIMARY CARE CENTRE TO ACCOMMODATE (1) GENERAL PRACTITIONERS SURGERY, (2) HSE FACILITIES COMPRISING CONSULTING ROOMS, WAITING AREAS, MEETING ROOMS, OFFICES AND ANCILLARY ACCOMMODATION AND (3) PHARMACY UNIT, THE CONSTRUCTION OF A SINGLE STOREY BUILDING TO ACCOMMODATE STORES, WASTE AREAS, PLANT ROOM WITH ASSOCIATED EXTERNAL PLANT AREA, NEW ACCESS ROADS, CARPARKING AND SET-DOWN TO SERVE THE DEVELOPMENT, BOUNDARY TREATMENTS INCLUDING BARRIERS AT THE SITE ENTRANCE, SITE LIGHTING, HARD AND SOFT LANDSCAPING, SITE SIGNAGE TO COMPRISE TOTEM SIGN AND SIGNAGE MOUNTED ON THE BUILDING, DIVERSION OF EXISTING UNDERGROUND SERVICES AND ALL ASSOCIATED WORKS
CONSTRUCTION OF A DWELLING HOUSE TO INCLUDE CONNECTION TO THE PUBLIC FOUL SEWER, SURFACE WATER DRAINAGE AND WATER MAINS SERVICES ON SITE BOUNDARY AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE, BOUNDARY FENCING, USE OF EXISTING ENTRANCE AND CONNECTIONS TO EXISTING SERVICES; ALL COMPLETED WITH ASSOCIATED SITEWORKS
(A) DEMOLITION OF EXISTING SINGLE STOREY VACANT COMMERCIAL PREMISES. (B) CONSTRUCTION OF 5 NO. DWELLINGS, CONSISTING OF 3 NO. 2 BED HOUSES AND 2 NO. 3 BED HOUSES. (C) ALL ASSOCIATED SERVICES CONNECTIONS AND SITE WORKS
CONVERSION OF EXISTING DWELLING TO 3 NO. APARTMENTS INCLUDING ALL ASSOCIATED INTERNAL ALTERATIONS, SERVICE CONNECTIONS AND SITE WORKS
Retention permission for Storage shed with concrete base and inspection pit, Retention for Demolition of Shed and reconstruction of new shed in its place and all associated site works
The brief summarizes the pattern across all 124 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18586The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief