Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 114 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Laois County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Laois County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Laois County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
No current-dated citation is loaded for Laois County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Construct a dwelling house, garage, wastewater treatment system & percolation area, new entrance and all associated site works
Retention planning permission for extension to existing dwelling house and all associated site works.
Extend and alter existing dwelling house and all associated site works
Demolish the existing shed and outbuildings, the demolition of elements of the existing dwelling, the construction of single storey extensions to the side and rear of the existing dwelling, the construction of a single storey garage / gym with associated car port to the rear of the existing dwelling, associated internal and external alteration works to the existing dwelling, modifications to the existing front boundary wall to form a courtyard area and new septic tank and percolation area together with all associated site development works
Construct new dwelling house and waste-water treatment system and polishing filter, bored well and domestic garage and new site entrance
Construct a dormer (and part single-storey) dwelling house, a single-storey domestic garage, a waste water treatment system, a site entrance through the existing field entrance and all associated site works
The brief summarizes the pattern across all 114 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 1865The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief