Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 215 decisions within 5 km, 1 exact-site or onsite candidate record, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development consisting of a total area of 26.3 Hectares comprising of the following: Permission for quarrying consisting of blasting, crushing, screening & washing of material and all associated site works on an area of 9.8 Hectares previously granted planning permission Ref No. PL04/673 and an additional 12.8 hectares of greenfield area: Permission for the relocation of the authorised concrete batching plant and construction of a block yard facility and settlement lagoon with an area of 3.7 hectares; Permission for erection of a fixed processing plant; Landscaping of the quarry during the operational phase and restoration of the quarry on completion of extraction; All associated ancillary facilities/works; The applicant is seeking a 40 year permission as part of the application; the application is accompanied by an Environmental Impact Assessment Report (EIAR)
To dispose of materials which will be inert materials, soils and subsoil on the lands to which this application relates so as to raise the existing ground level, creation of an access road and vehicular turntable and all associated ancillary works
A. Alterations to front, rear and side facades; b. Demolishing existing two-storey barn to front; c. Demolishing flat roof of rear porch; d. New flat roof single storey extension to front; e. New two-storey pitched roof extension to side; f. New pitched roof to rear porch; and all associated site works
A) Construction of an extension to the side and rear of an existing single storey cottage. b) Replacement of existing porch. c) Conversion of existing attached outhouse building into habitable accommodation together with extension to the rear of the same to service existing single storey cottage type dwelling. d) Internal renovations of existing dwelling and all ancillary site works
The proposed relocation of a four bay single slatted shed with underground effluent storage tank in the same field but in a south eastern direction from where it was previously granted full planning permission under planning reference number PL19/161 and all ancillary works
On a site previously granted planning permission under planning file ref. no. 20/93. The development will consist of the construction of a two storey type dwelling house with single storey elements, detached domestic garage, new entrance, boundary walls, piers and fencing, proprietary wastewater treatment unit and percolation area and all ancillary site works
The brief summarizes the pattern across all 215 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19197The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief