Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 66 decisions within 5 km, 2 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To retain and complete the widening of an existing entrance and associated works to facilitate the extraction of timber from a forestry plantation in lieu of Retention Permission to retain the widening of an existing entrance to facilitate the extraction of timber from a forestry plantation
(a) construct a dry bedded/slatted agricultural shed and yard and (b) retain existing agricultural sheds and yards
(a) construct a dormer type domestic dwelling in place of the existing habitable dwelling; (b)demolish the existing domestic garage and replace with a new domestic garage; (c) convert the existing habitable dwelling into an agricultural building; (d) upgrade the existing Waste Water Treatment System to current EPA Code Of Practice and all ancillary works.
Construct a slatted/dry bedded agricultural building and all associated ancillary works
A) Change of Use of The Old Granary to provide holiday let accommodation. b) Decommissioning of the existing septic tank serving the dwelling. c) Installation of a new wastewater management system serving both the existing dwelling and proposed refurbished Granary. d) Demolition of existing storage building. e) All associated external works
(a) Retention of Extension to the Rear of the Dwelling House, (b) Retention of Storage Sheds for use Ancillary to the Dwelling House, and (c) Retention of Polytunnel for use ancillary to the Dwelling House with all associated site development works
The brief summarizes the pattern across all 66 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19279The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief