Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 146 decisions within 5 km, 2 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For: 1.The demolition of the existing single storey, over part basement, medical centre on the site; 2. The construction of a new two-storey Primary Care Centre incorporating a GP Suite and a dispensing pharmacy, total approx. floor area of 1,236sqm; 3. The construction of an external refuse compound/store; 4. Associated signage on the building and a free standing sign at front of the car park roadside adjacent to the main entrance; 5. Connection to the existing foul and storm water services, upgrading of the existing vehicular entrance and a new car parking layout; 6. Boundary treatments at
Permission for change of use of existing protected structure (RPS No. 00800306), comprising dental surgery, to use as a dwelling house at
Permission for 1.To demolish existing rear extension and sheds, 2.To refurbish existing house to include alterations to elevations, 3. To construct new rear extension to same,4. To construct new domestic garage, 5.To provide alterations to existing site entrance and front boundary walls and define side boundaries with post & rail fence, and carry out all ancillary site development works at
Permission for development which will consist of removal of external metal fire exit staircase, demolition of roadside boundary wall, demolition of three no. single-storey blocks, demolition of two-storey toilet block and links, partial demolition of single-storey bungalow, construction of two-storey and single-storey extension consisting of mainstream classrooms accommodation, multi-purpose room, two-storey fire exits, ancillary facilities and special needs education facility, energy upgrade with PV array on flat roof, extension and upgrade of existing foul drainage network connecting to existing public sewer, surface water connected to new attenuation tank with hydrobrake linking to existing surface water drain, reconfiguration and extension of car park, bus drop-off, bicycle parking, street lighting, EV charging, boundaries and other associated siteworks at
Planning permission to construct a single storey "LogCabin Type" Childcare Facility with connection to public sewer and all associated site works at
Permission to make material alterations to include an attic conversion and to construct extensions to an existing unused Childcare Facility (Previous Planning Grant PD/04/1138) in order to provide a new Childcare Facility (to be called "The Growing Tree" Childcare Centre) with connection to public services and all associated site works at
The brief summarizes the pattern across all 146 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19602The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief