Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 80 decisions within 5 km, 5 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For development consisting of the change of use as permitted under PL 06/466 from retail unit (total area 87.5m2) to restaurant together with signage all associated works
Development consisting of the erection of a permanent covered structure to the paved area outside existing restaurant for the purpose of outdoor dining
Development consisting of proposed change of use from retail unit to restaurant extension for 'Bella & Brava' Restaurant
Permission for change of use as permitted under PL 06/466 from retail unit (total area 105M2) to Ceramic Studio with retail together with signage, all associated works at Unit 6, The Mill Centre, Coolaney.
Development consisting of the retention to the existing shed and all the associated site works to the rear of property
Development conisting of retention of; 1. partially constructed house with blockwork up to first floor level, 2. site development works and 3. access to estate road. Also, completion of construction of house, site development works and connection to services for house partially constructed on a site.
The brief summarizes the pattern across all 80 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1976The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief