Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 22 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development located in the townlands of Bargowla, Boleymaguire, Braudphark, Derreens, Derrybofin, Derrycullinan, Derrycullinan Beg, Drummanacappul, Garvagh, Garvagh Glebe, Glassalt, Lisfuiltaghan, Seltan, Sheena and Tinnybeg, County Leitrim consisting of: (a) Construction of 8 No. Wind turbines with a maximum overall blade tip height of up to 170 metres, and associated hard-stand areas; (b) 1no. 38kV permanent electrical substation including a control building with welfare facilities, all associated electrical plant and equipment, security fencing, all associated underground cabling, waste water holding tank and all ancillary works; (c) all associated underground electrical and communications cabling connecting the turbines to the proposed wind farm substation; (d) all works associated with the connection of the proposed wind farm to the national electricity grid, via underground cabling to the existing Garvagh substation; (e) upgrade of existing tracks and roads, provision of new site access roads and hard-stand areas; (f) the partial demolition and alteration of two agricultural buildings in the townlands of Sheena and associated junction access and road works to the existing yard, agricultural buildings and agricultural lands in the townlands of Sheena and Derrybofin to provide link road primarily for construction traffic off the R280. this link road will be for the delivery of abnormal roads to the site during the construction period and may be used during the operational period if necessary or to facilitate the decommissioning of the wind farm. Following construction, access to the link road will be closed off and the yard / agricultural building will revert to its use for agricultural purposes except if and when required for delivery of abnormal loads during the operation period of the wind farm or to facilitate the decommissioning of the wind farm (g)1 no. borrow pit; (h) 2 no. peat and spoil repository areas; (i)2 no. temporary construction compounds; (j) recreation and amenity works including marked trails, boardwalk and viewing area, provision of a permanent amenity car park, and associated recreation and amenity signage; (k) site drainage; (l) permanent signage, (m) ancillary forestry felling to facilitate construction and operation of the proposed development and (n) all associated site development works. An Environment Impact Assessment Report (EIAR) and a Natura Impact Statement have been prepared in respect of the proposed development
PP - for development consisting of a ten-year planning permission for a renewable energy development with a 30-year operational life (from the date of commissioning along with a recreational and amenity facility. The entirety of the renewable energy development constitutes the provision of a ten-turbine wind farm and associated site works on lands in both Counties Leitrim and Sligo. The development will consist of: i. Construction of 2 no. wind turbines with a maximum overall blade tip height of up to 170 metres and associated hardstand areas; ii. 1 no. permanent Meteorological Mast with a maximum height of up to 100 metres, iii. All associated underground electrical and communications cabling connecting the turbines to the proposed wind farm 38kV electricity substation (which is proposed to be located in the townland of Garvagh Glebe, Co Leitrim); iv. Upgrade of existing tracks, roads and provision of new site access roads; v. Recreation and amenity works, including marked trails and associated recreation and amenity signage; vi. Site drainage; vii. Permanent signage; viii. Ancillary forestry felling to facilitate construction and operation of the proposed development; and ix. All associated site development works. A concurrent planning application is being lodged with Leitrim County Council in relation to the elements of the project that are within County Leitrim (which include the provision of 8 no. wind turbines, electrical substation, underground cabling, connection to national electricity grid, access tracks/roads, access junction improvements, amenity works and all associated works). An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted with the application.
Development consisting of an existing lattice type temporary meteorological mast 80m in height and associated instrumentation and works and the continuation of its use to measure local climate conditions for a period of a further five years
For the installation of approximately 0.46km of underground cable ducting, 1 no. joint bay and ancillary development laid primarily within the public road corridor, with a section of circa. 0.07km within private lands at Seltan. A Section of ducting is to be installed within a steel box structure to be fixed to Boleymaguire Bridge within the townland of Boleymaguire, Co. Leitrim. Within the townland of Boleymaguire, permission is sought for the carrying out of remedial works to approximately 0.44km of the installed underground cable ducting which is subject to a pending application for Substitute Consent to An Bord Pleanála (Ref: ABP-300811-18), remedial works include the relaying of backfill material. Permission is also sought for the installation of the electricity cable following the completion of the civil works. The development will comprise part of an overall development in Counties Leitrim, Sligo and Roscommon, consisting of the laying of an underground 38 kv electricity cable and associated ducting and ancillary development primarily within the public road to facilitate the connection of the permitted Derrysallagh Wind Farm, Co Sligo (Sligo County Council planning reference: PL 12/133) to the national electricity grid via the existing Garvagh 110kv substation in the townland of Seltan, Co Leitrim. Part of this development is in place and subject to a pending application for Substitute Consent to An Bord Pleanala (ref: ABP-300811-18). This application is accompanied by an Environmental Impact Assessment Report (EIAR)/Environmental Impact Statement (EIS).
Ten year planning permission with a 40-year operational life (from the date of commissioning of the development). (ii) Construction of 4 No. wind turbines with an overall ground to blade tip height ranging from 149.85m to 150m inclusive. The wind turbines will have a rotor diameter ranging from 115.7m to 117m inclusive and a hub height ranging from 91.5m to 92m inclusive. (iii) Construction of permanent turbine hardstands and turbine foundations. (iv) Construction of a bottomless bridge culvert across a minor stream on site (EPA River Segment Code: 26_4053). (v) Construction of one temporary construction compound with associated temporary site offices, parking areas and security fencing. (vi) Installation of one (40-year life cycle) meteorological mast with a height of 50m and a 4m lightning pole on top. (vii) Construction of new internal site access tracks and upgrade of a section of existing internal Site track, to include all associated drainage. (viii) Improvement of existing site entrance with access via the L4282. (ix) Development of an internal site drainage network and sediment control systems. (x) Construction of 1 no. permanent 20kV electrical substation. (xi) All associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation. (xii) All works associated with the connection of the wind farm to the national electricity grid, which will be via 20kV underground and partially overhead cable connection approximately 6.4km in length to the existing ESB Corderry 110kV Substation in the townlands of Letter, Greaghnadarragh, Stangaun, Corralustia, Turpaun, Gortnasillagh West, Lugmeeltan, Leckaun, Lisgavneen, Treannadullagh, Drumcashlagh and Corderry. (xiii) Ancillary forestry felling to facilitate construction of the development. (xiv) All associated site development works including berms, landscaping, and soil excavation. (xv) Installation of battery arrays located within container units (2 no. units) and associated electrical plant for grid stabilisation adjacent to the substation building. (xvi) Development of one on-site borrow pit.
A twenty (20) year planning permission for continuations of the operational life of the existing wind farm (SCC Reg. Ref 98/533 & ABP Pl Ref. 21.110572 as amended by SCC Reg Ref.04/1315) from the date of expiration (23rd June 2025) of the current permission. No modifications are proposed to the existing wind farm which comprises the follow elements: a. 4 no. existing wind turbines with a hub height of 44m and a rotor diameter of 52m; b. Existing 1 no. onsite electrical substation compound which includes a control building, welfare facilities, associated electrical plant and equipment, security fencing, associated underground cabling; c. All associated existing underground electrical and communications cabling connecting the turbines to the on-site substation; d. Existing site access tracks of c.1.5km in length and 4 no. turbines hardstandings; e. Existing site drainage and; f. All existing ancillary infrastructure, associated site fencing and signage
The brief summarizes the pattern across all 22 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20120The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief