Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 76 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of alterations to a previously permitted wind farm development (Planning Register References 14/139 & 19/597 (Laois), 14/202, 15/629 & 19/787 (Kilkenny) and 14/510138 & 15/600924 (Tipperary)) where the permitted development also extends into the townlands of Bruckana, Baunmore and Rathpatrick, County Kilkenny and Killoran near Templetuohy, County Tipperary. The proposed alterations will consist of: increasing the tip height of the two permitted turbines from a maximum of 156m to a maximum of 169m and extending the operational lifetime of the wind farm, from the date of commissioning, from 25 years to 30 years. A ten-year permission is sought. The application is accompanied by a Natura Impact Statement, Planning Report and Environmental Considerations Report. Lisheen III Wind Farm Limited also intends to apply to Kilkenny County Council for planning permission for development at Bruckana, Baunmore and Rathpatrick, County Kilkenny. The proposed alterations will consist of: increasing the tip height of six permitted turbines from a maximum of 156m to a maximum of 169m and extending the operational lifetime of the wind farm, from the date of commissioning, from 25 years to 30 years. The planning application includes a Natura Impact Statement.
Construct a slatted slurry tank, slatted channel and open cubicles, concrete apron and associated works
Alter previously permitted wind farm development (Planning Register References 14/139 (Laois), 14/202 & 15/629 (Kilkenny) and 14/510138 & 15/600924 (Tipperary)) where the permitted development also extends into the townlands of Bruckana, Baunmore and Rathpatrick, County Kilkenny and Killoran near Templetuohy, County Tipperary. The proposed alterations will consist of: increasing the turbine rotor diameter of the two permitted turbines from a maximum of 113m to a maximum of 136m, while maintaining the overall tip height of up to 156m per the permitted development. A ten-year permission is sought. The application is accompanied by a Natura Impact Statement, Planning Report and Environmental Considerations Report. Lisheen III Wind Farm Limited also intends to apply to Kilkenny County Council for planning permission for development at Bruckana, Baunmore, Rathpatrick, County Kilkenny. The propped alterations will consist of: increasing the turbine rotor diameter of six permitted turbines from a maximum of 113m to a maximum of 136m, while maintaining the overall tip height of up to 156m per the permitted development
Construct a one and a half storey dwelling, access / egress drive and a sewage treatment system complete with all ancillary site works and services.
For the following: A) Construction of an Agricultural Cubicle Shed B) Construction of an unroofed Buffer Feed Passage and underground Slatted Tank C) Construction of a Geomembrane Slurry Lagoon and all associated site works at
For extension to existing dwelling house consisting of Sun-Room, Kitchen-Dining Room, Bedroom/Ensuite, Living Room, Play Room, and Office and associated site works on my lands
The brief summarizes the pattern across all 76 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20386The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief