Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 78 decisions within 5 km, 3 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Planning Permission to fill/raise the land by importation of principally soil and stone and enearth construction and demolition waste material, all as per drawing documentation submitted together with all ancillary site works and services.
FILL/RAISE THE LAND BY IMPORTATION OF PRINCIPALLY CONSTRUCTION AND DEMOLITION WASTE MATERIAL TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES.
CONSTRUCT A DWELLING HOUSE, GARAGE AND SEPTIC TANK/FOUL EFFLUENT TREATMENT SYSTEM ALL AS PER DRAWING DOCUMENTATION SUBMITTED TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES
CONSTRUCT A DWELLING HOUSE AND GARAGE, WITH SEPTIC TANK AND PERCOLATION AREA, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES
Construct a dry agricultural building with an effluent tank, and ancillary concrete slab, including all ancillary site works and services
EXTRACTION OF UP TO 40,000 TONNES PER ANNUM OF GRAVEL DEPOSITS OVER A 2.3 HECTARE EXTRACTION AREA, WITHIN A 2.4 HECTARE DEVELOPMENT SITE, REMOVAL OF GRAVEL OFF SITE, RESTORATION OF THE GRAVEL PIT AND PROVISION FOR OCCASIONAL DRY SCREENING. THE APPLICANT IS SEEKING A 15 YEAR PERMISSION.
The brief summarizes the pattern across all 78 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20389The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief