PP - development consisting of: (a) construction of new dwelling house, (b) domestic garage, (c) constructed new septic tank treatment system and associated works, (d) construction of new entrance to public road, (e) connection to all services and utilities (f) carrying out of all ancillary works as required on site
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Crowagh or Dunneill Mountain , Dromore West , Co Sligo
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
6% of nearby decided applications were refused. The preview found 54 nearby planning records within 5 km where a location match is available.
- Matched source
- 20421
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
PP - for development consisting of (a) Construct new dwelling house and domestic garage, (b) Construct new septic tank and treatment system and associated works, (c) Construct new entrance to public road, (d) Connect to all services and utilities, (e) Carry out all ancillary works as required on site
Planning permission to retain & complete existing domestic garage along with the carrying out of all associated ancillary site works at Crowagh Td., Dromore West, Co. Sligo (Eircode: F26PT9C).
Development consisting of a fifteen (15) year continuation of the operational life of the existing wind farm (SCC Reg. Ref. PL03/619 & ABP Pl. Ref. 21.204790, as amended by SCC Reg. Ref PL10/371 and PL10/388) from the date of expiration (March 2024) of the current permissions. No modifications are proposed to the existing windfarm which comprises the following elements: (a) 13 no. existing Vestas V52 850 kilowatt (kW) wind turbines with a maximum overall blade tip height of 75 metres (m) (b) Existing 1 no. onsite 20 kilovolt (kv) electrical substation compound which includes a control building, welfare facilities, associated electrical plant and equipment, security fencing, associated underground cabling and a foul waste holding tank (c) Existing 1 no. permanent meteorological mast with a height of 50m and an associated concrete platform/base; (d) All associated existing underground electrical and communications cabling connecting the turbines to the on-site substation; (e) Existing site access tracks of circa 3.3 kilometres (km) total length, 3 no. car parking spaces and 13 no. turbine hardstands; (f) 2 No. existing gated site entrances from an unnamed third-class public road which dissects the windfarm site into north and south; (g) Existing site drainage; and (h) All existing ancillary infrastructure, associated site fencing and signage. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and accompanies this application.
(1) to retain the existing extension to the rear of dwelling house (2) to retain the existing garage (3) to retain the existing domestic shed (4) to retain the revised site boundaries (5) and all associated site works
(1) Demolish existing shed and flat roof extensions to existing cottage (2) Refurbish existing cottage and construct new extensions to front and rear elevations (3) Decommission existing septic tank and install new on site waste water treatment system and percolation area (4) Carry out all ancillary site works
The brief summarizes the pattern across all 54 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 20421The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief