Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 206 decisions within 5 km, 3 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To retain (1) existing storage shed extension to the north east of existing pig unit complex, (2) 2 no mobile home units to north east boundary of the site, (3) amended site layout plan to include for amended site boundary, and (4) PERMISSION to complete associated and ancillary site works. This application relates to a development, which is for the purposes of an activity requiring a licence under Part IV of the Environmental Protection Agency (Licensing) Regulations 1994 to 2013
To erect fully serviced clubrooms facilities with attic accommodation and turnstile building, connection to existing services and all ancillary and associated works, also permission sought to demolish existing dressing room building and stores. Significant further information and revised plans have been submitted
RETAIN works and complete works carried out for development to include: (1) the removal of the existing rear pitched roof and the construction of a new first floor rear extension with a new pitched roof over the existing dwelling and new first floor extension, including build up gable walls to u/side of new roof. The new pitched roof ridge level (over existing dwelling and new extension) is 1.59M higher than the existing pitched roof ridge level. When completed the existing dwelling and extension will become a 4-bedroom dwelling, the existing dwelling is currently 2-bedrooms (2) the construction of a 2-storey pitched roof front extension to the existing dwelling (3) and all necessary ancillary site development works to facilitate this development. PLANNING PERMISSION is sought for (4) decommission existing septic tank and install a new wastewater treatment system and percolation area
The construction of communications infrastructure comprising of a 30 metre lattice tower, associated equipment, cabinets, cabin, fencing, use of existing access and extension of access track. Significant further information and revised plans have been received
To carry out the following alterations to existing dwelling house: (1) Demolish single storey extension to rear of original dwelling house, (2) Construct new single storey extension and carry out renovation works to original dwelling house & (3) Upgrade existing septic tank to new mechanical waste water treatment system & percolation area
For dwelling house comprising part two storey, part single storey, detached domestic garage, effluent treatment system, percolation and alterations to existing access
The brief summarizes the pattern across all 206 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 206The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief