Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 296 decisions within 5 km, 2 exact-site or onsite candidate records, and 23 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
23 structured nearby appeal records.
23 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Works at an existing guest house, providing additional accommodation for persons with disabilities. The development will consist of a detached two storey building comprising 3 no. 3 bedroom family pods, a detached single storey recreational building with games room, sensory room, administration office and hot tub area and outdoor sensory garden, together with all associated site works, including connections to existing drainage system and watermain
(a) works to footpath and driveway to improve access, (b) 2m high screen wall enclosing a patio to the rear of the building, (c) replacement of a canopy that extends between the existing plant room and existing shed, and (d) the installation of a metal clad shed measuring 5m x 8m for the temporary storage of furniture and equipment. The work being undertaken is not part of the development for which applicant seeks planning permission ( Ref No 21/275)
Development consists of change of use of Office building to Islamic Cultural Centre
An application for extension of duration of 3 years on original planning permission ref P.20/130
Development consisting of (A) the construction of a 2-storey split level 90 bed Community Nursing Unit comprising 50 long stay beds, 20 Short stay beds and 20 Dementia beds. The proposed building includes associated recreational living spaces, dining spaces and ancillary service spaces on all habitable levels, together with the construction of a designated Rehabilitation Facility on Level 2; (B) the construction of a new site access road off the R280 together with associated footpaths, margins and pedestrian crossing; (C) External works comprising the construction of circa 97 new car parking spaces including e-car charging bays and the development of external landscaped gardens, together with associated site development works, works to site boundaries, services and signage
(1.) retain the conversion of a former void space to the rear of the ground floor apartments in two separate apartment blocks into living accommodation, including the retention of window openings to the ground floor elevations; and (2.) the extension of 2 no. existing 3 bedroom duplex apartments to create 2 no. 4-bedroom duplex apartments in two separate apartment blocks and thereby 4 no. 4 bedroom apartments in total by incorporating the living accommodation space for which retention permission is being sought.
The brief summarizes the pattern across all 296 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21275The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief