Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 693 decisions within 5 km, 1 exact-site or onsite candidate record, and 39 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
39 structured nearby appeal records.
39 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of a new manufacturing facility, warehouse and offices and associated car parking and deliveries areas and all site works and services
The development will consist of the retention of elevational alterations to the west, east and north facades to accommodate the relocation of internal offices to external walls, reconfiguration of building footprint and addition of electrical substation and switchroom to the north facade and locating additional warehouse doors to the north facade and reconfiguration of building footprint with no nett change in approved floor area of the building approved under planning reference 206220 and the retention of four external sculptural columns to the west side of the building and all associated site works and services.
Construction of a high bay warehouse and manufacturing extension to the rear of the existing facility, with 20m high exhaust flue and all associated site works and services.
Retain 84m2 mezzanine/office space at Bay 3, alterations to external glazing of west facade of Bay 3 and all associated site works
(i) new ground floor development (130 sq mtr) for office use, (ii) Change of use of existing store (135 sq mtr) to ancillary area to suit new office use. (iii) New first floor development (265 sq mtr) for office use. (iv) New internal first floor infill (570 sq mtr) for office use (v) New first floor development (280 sq mtr) over existing ground floor building for office use. (vi) Change part of existing south and west elevations to selected metal cladding and curtain wall finishes with new external doors, including all associated internal modifications and external site works
The development will consist of a new manufacturing facility, warehouse and offices and associated car parking and delivery areas and all site works and services
The brief summarizes the pattern across all 693 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21398The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief