Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 120 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Sligo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Sligo County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Sligo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedNo current-dated citation is loaded for Sligo County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Development consisting of (a) demolish existing dwelling house and outbuilding on site (b) construct a single storey dwelling house with connection to existing public sewer on site, together with all ancillary site works
High-power electric vehicle charging points and associated infrastructure consisting of the following: I. Installation of 8no. electric vehicle charging bays with 8no. Tesla illuminated charging units and associated signage, II. Installation of proposed Tesla supercharger power cabinet equipment, III. Installation of proposed modular substation, IV. Erection of associated EV signage, V. Re-location of an existing lighting pole, VI. All associated site development works including surfacing, lighting & line marking.
Alterations and additions to an existing dwelling house including demolition of an existing extension, a new vehicular entrance, a new effluent treatment system and for all associated site works.
PP - for development consisting of (1) construction of a 38 sq.m. Extension to the south side of existing dwelling and (2) construction of a 2 sq.m porch to the front of the dwelling including all associated siteworks.
Development consisting of the revised design of previously approved application no. 20327
Development consisting of: demolition of existing disused Shop/Dwelling, erection of a momestic dwelling with connection to public services and all ancillary site works
The brief summarizes the pattern across all 120 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 21508The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief