Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 323 decisions within 5 km, 4 exact-site or onsite candidate records, and 15 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
15 structured nearby appeal records.
15 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extension of Duration to construct a new storey and a half type dwelling house, domestic garage, new vehicular entrance, wastewater treatment system & soil polishing filter and all ancillary site services
To construct a new storey and a half type dwelling house, domestic garage, new vehicular entrance, wastewater treatment system & soil polishing filter and all ancillary site services at
New flat roof extension to the side of the existing dwelling, house, new glazed conservatory to the side and rear of the existing dwelling house, removal of the existing temporary metal storage building and replacement with new permanent detached garage/storage building, garage/storage building.
RETENTION of the existing attic conversion to non-habitable space (55.8sqm), which consists of a landing, a den, storage, shower room and attic storage. Permission is also sought to retain the existing balcony to the rear of the dwelling and all associated site works
Development consisting of (a) the construction of two Padel Court’s each 20m x 10m including the Installation of 3.0m high panoramic glazed exterior surrounds with an additional 1.0m high ball stop mesh at both ends of court’s and 4no 6.20m high floodlight posts on each court. (b) Construction of concrete pathway surround and artificial grass to court waiting area. (c) Removal of 1no existing 5m high wooden pedestrian lamp post (d) and all associated site services
Development which will consist of (1). Construction of a new artificial grass playing surface 116 m x 74 m including a run-off area and ancillary footpaths. (2). Installation of 3.0 m high Perimeter fencing with 3.0 m high ball stop nets on top. (3). Install 8 no 18 m high floodlight columns and all associated site services
The brief summarizes the pattern across all 323 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21576The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief