Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 2,868 decisions within 5 km, 7 exact-site or onsite candidate records, and 323 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
323 structured nearby appeal records.
323 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for development which consists of the construction of an extension to existing dwelling to contain a study together with all associated site works
Permission for development which will consist of the construction of an extension to existing dwelling to contain study and toilet together with all associated site works
Permission for development which consists of; (i) the demolition of existing garden shed, (ii) the construction of single storey extension to the rear with new garden shed, (iii) the construction of new dormer structures to the existing roof both front and rear, (iv) alterations to elevations, (v) all associated site works.
Permission for retention which consists of a single storey rear sunroom/utility extension
Permission for development which consists of 1. The demolition of the existing Public House and adjoining shed/garage structures; 2. The construction of a hotel development with 3 floors over ground floor level and 2 floors below ground floor level comprising of 182 no. rooms. The proposed development contains reception areas, dining and resident lounge spaces, kitchen, storage, staff welfare areas, plant room, enclosed service area, ESB substation and switch room, refuse and bicycle storage areas; 3. All other associated site works, including public realm improvements, water/wastewater services, landscaping and pedestrian linkages, roof mounted solar panels, lighting and ancillary signage.
Permission for development which will consist of a hostel development and retail unit on a site extending to 2,697.54sqm.The development consists of 1.The demolition of the existing pub and adjoining shed/garage (588.3sqm; 2.The construction of a hostel development with 3 floors over ground floor level and 2 floors below ground floor level, comprising 163 no. rooms (5,217.36sqm); 3. The provision of a retail unit (308.88sqm); 4. Public realm and landscaping works including pedestrian linkages and cycle parking spaces; 5. All other associated site development and servicing works
The brief summarizes the pattern across all 2,868 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22224The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief