Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
19% of nearby decided applications were refused. The site check found 135 decisions within 5 km, 1 exact-site or onsite candidate record, and 92 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
92 structured nearby appeal records.
92 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a fully serviced 4 bed dormer dwelling house with home-based office, domestic garage with attic store, Tricel wastewater treatment plant and percolation area, vehicular access and associated site works
The construction of a new two story dwelling house, domestic garage, domestic well, onsite wastewater treatment plant and percolation area along with all associated site and landscaping works
To construct a dwelling house with domestic garage, new effluent disposal system to current EPA standards, bored well and new site entrance along with all ancillary site works
Construction of a glamping site including the following; 1) eight number pods, 2) upgrade of existing agricultural entrance to proposed entrance, 3) access road, 4) signage at entrance, 5) main building including toilet facilities, kitchen and communal area, 6) septic tank and percolation area along with all associated site works
Permission for the construction of a bungalow dwelling house and all associated site works
A storage shed and all associated site works
The brief summarizes the pattern across all 135 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22394The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief