Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 111 decisions within 5 km, 6 exact-site or onsite candidate records, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched1 of 2 layers are loaded for Roscommon County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Roscommon County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for Roscommon County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedNo current-dated citation is loaded for Roscommon County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Retention Permission to retain a temporary mobile home structure for a period not exceeding 18 months to provide owners living accommodation during construction works to the property at
Retention Permission for a temporary mobile home structure for a period not exceeding 18 months to provide owner's living accommodation during construction works to the property known as Hick's Mill at
1. Retention Permission to retain and complete partially constructed rear extension at ground floor level and Permission to construct first floor extension to same; 2. Retention Permission to retain change of use of from commercial mill to residential use; 3.Permission to demolish extended door entry annex between mill and cottage and to construct new flat roof link; 4. Permission for alterations to front and rear elevations to include restoring front of cottage and mill to former vernacular style; 5. Permission to upgrade existing entrance by constructing new wing walls and gate; 6. Permission to upgrade existing septic tank to a proprietary treatment system with tertiary treatment and all ancillary site development works at
Permission to construct dwelling house along with domestic garage, new treatment system and percolation area and all ancillary site development works at
To erect a new dwelling house and provide a sewerage system and a treatment plant, to provide secondary and tertiary treatment, and all associated works at
Permission for development consisting of the construction of a single storey dwelling house with effluent treatment unit, domestic garage & access drive with associated site works (Application made for: Permission for development consisting of the construction of two storey dormer dwelling house with effluent treatment unit, domestic garage & access drive with associated site works) at
The brief summarizes the pattern across all 111 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22600The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief