Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,184 decisions within 5 km, 7 exact-site or onsite candidate records, and 125 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched1 of 2 layers are loaded for Kerry County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kerry County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kerry County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
125 structured nearby appeal records.
125 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kerry County Council development plan.
1 matchedOpen preview
Open preview
(A)DEMOLISH THE EXISTING KILLARNEY AUTOS/DALY MOTORS LTD (B) PLANNING PERMISSION TO CONTRUCT RESIDENTIAL BUILDING COMPRISING OF 43 APARTMENTS (C) PERMISSION TO CONSTRUCT NEW CAR PARKING ON THE GROUND FLOOR AND ALL ANCILLARY SERVICES AND ALL ASSOCIATED SITE WORKS
CHANGE OF USE FROM EXISTING COMMERCIAL BANK TO A SOUTH DOC/DOCTORS SURGERY WITH EXTERNAL AND INTERNAL CHANGES AND ALL ASSOCIAGTED SITE WORKS
We, Focus Housing Association CLG intend to apply for permission for development comprising amendments to the development permitted under KCC Ref. 21/205 on a site of 0.243 ha on lands at Woodlands Industrial Estate, Killarney Bypass Road, Park Townland, Killarney, Co. Kerry, V93 RX06The proposed development comprising amendments to the permitted scheme consists of reconfiguration of basement to incorporate water tanks, attenuation tank, lift pit, ESB substation, meter room and switch room; 2 no. service access doors in addition to a fire escape door to be provided from N22 Bypass Road; Reconfiguration of ground floor plan to include modifications to bicycle parking (overall increase of bicycle spaces to 136 no.), bin area, lift pits, stairways and pedestrian access; Modifications to car parking area at ground floor level (from 80 no. spaces to 74 no. spaces including 4 no. accessible spaces); Modifications to communal open space provision and landscaping (from 719 sqm to 375 sqm) due to omission of a roof terrace and alterations at first floor podium level; Reconfiguration of permitted floor plans on each level to provide for amended unit layouts with associated balconies/terraces and with amended vertical & horizontal circulation ( in each block ). Total provision of 67 no. units remains unaltered with now proposed mix of 33 no. 1 bed and 34 no. 2 bed units. Minor modifications to the footprint of Block A and B and alterations to all elevations. The proposed changes will result in an increase of total gross floor area by c.871.5 sqm; no change to maximum height (the number of storeys has not increased) as previously permitted. Permission is also sought for temporary removal of the existing retaining wall adjacent to the N22 Bypass Road which will be subsequently rebuilt to match existing height and material finish. Permission is sought for all associated site development and infrastructural works.
(A) DEMOLISH FORMER ADVANCE TYRES BUILDING (B) CONSTRUCT 5 STOREY BUILDING COMPRISING OF THE CONSTRUCTION OF 67 APARTMENTS (D) CONSTRUCT CAR PARKING ON THE GROUND FLOOR ALL ANCILLARY SERVICES AND ALL ASSOCIATED SITE WORKS
RETAIN (A) EXISTING TYRE STORAGE SHED (B) TYRE FITTING SHED (C) DOMESTIC STORAGE SHED
CHANGE USE OF EXISTING PREMISES FROM DWELLING HOUSE TO OFFICE UNIT
The brief summarizes the pattern across all 1,184 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2289The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief