Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
20% of nearby decided applications were refused. The site check found 522 decisions within 5 km, 1 exact-site or onsite candidate record, and 67 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Wicklow County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Wicklow County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Wicklow County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
67 structured nearby appeal records.
67 matchedCitations are current-dated and carry policy name, section, page and source URL from the Wicklow County Council development plan.
2 matchedOpen preview
Open preview
Development of a Solar PV Panel Array consisting of up to 30,000m2 (3 Hectares) of solar panels on ground mounted steel frames on an 8.399 hectare site, electricity control room, power inverter unit, underground cable ducts, security fence, CCTV masts, Solar Lighting and all associated works.
Redevelopment of existing sawmill and workshop to include (a) change of use to existing ground floor workshop to commercial office usage (b) change of use of existing disused metal fabrication workshop for use as domestic storage purposes (i.e. the storing of vintage cars) (c) alterations to the section and the existing roof above the disused metal fabrication workshop to facilitate the provision of additional floor area for use as an office / storage for domestic / non commercial use (d) the provision of an external terrace to serve existing first floor offices (e) alterations to elevations including new timber sheeting to façade, alterations to fenestration new doors (f) together with all associated site works
Construction of a rear extension, which includes a playroom and garage store area, to existing dwelling and associate works
1. a sand arena covered by a shed structure 2. a concrete retaining wall 3. a covered dung stead and associated works
Installation and use of 3 no. dry composting toilets for use by Tirmor allotment users
For the installation and use of 2 no. underground Rainwater Harvesting storage vessels of up to 150,000 litres capacity for use by Tirmor allotment users
The brief summarizes the pattern across all 522 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 231The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief