Applications tied to the site
Partial coverage11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 2,890 decisions within 5 km, 11 exact-site or onsite candidate records, and 329 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
329 structured nearby appeal records.
329 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for development which consists of retention permission for minor elevation alterations including 1no. additional rear facing roof window
Permission for development which will consist of the Retention of Roof construction over back door adjoining toilet facilities to the rear of premises known as Crowes Bar
Permission for retention which consists of a single storey rear sunroom/utility extension
Permission for development which consists of: retention permission is sought by Golden Birches Limited, at The Dean Hotel, No. 80 Prospect Hill and No’s 82, 84 & 86 Bohermore, Galway City, for revisions to the development permitted under Pl. Ref. No.’s 17/41, 22/19 & 22/248. No. 86 Bohermore on site is a protected structure (RPS No. 1201). The development consists of (1) Retention of additional floor area at lower ground floor level, (2) Retention of increased floor area at third floor level, and (3) Retention of change of use of third floor from bedroom accommodation to restaurant and rooftop bar, together with all associated site works and services.
Permission for retention which will consist of revisions to the development permitted under Pl. Ref. No. 17/41. No.86 Bohermore is a protected structure (RPS No. 1201). The development consists of (1) Retention of relocation of ESB sub-station towards the southern boundary of the site (to the rear of the Hotel) together with associated revisions to landscaping to provide screening (2) Retention of revised surface layout to the rear of the Hotel including revised turning area arrangements and a reduction in the number of on-site car parking spaces from 13 to 8 (3) Retention of high level Hotel signage to the front and side elevations, together with all associated site works and services
Permission for development which will consist of retention of revisions to the development permitted under Pl. Ref. No's. 17/41 and 22/19 including (1) retention of relocation of ESB sub-station towards the southern boundary of the of the site (to the rear of the hotel), together with associated revisions to landscaping and boundary treatments along the rear southeast boundary (2) retention of low level hotel restaurant and bar signage to the front elevation (Northwest elevation) and (3) retention of fire escape gate and route at south corner of site (onto access lane exiting onto Prospect Hill), together with all associated site works and services to protected structure (RPS No. 1201)
The brief summarizes the pattern across all 2,890 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23235The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief