Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 193 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Westmeath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Westmeath County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Westmeath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedNo current-dated citation is loaded for Westmeath County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Development consisting of the installation of 710m2 (145kW) of ground mounted solar photovoltaic (PV) panels and all associated ancillary works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application
Permission to construct one number detached single storey dwelling, upgrade existing entrance to public road, connect to public watermain, install a packaged wastewater treatment system and polishing filter and all associated site works(previously granted permission under planning file Ref: 13/6103).
(a) RETENTION of existing single store extension to rear of existing dwelling, (b) decommission & sterilise existing septic tank & (c) install a new proprietary wastewater treatment system and all associated site development works
The development will consist of the continued use and operation of the existing quarry (permitted under P.A. Ref. 01/525), including deepening of the quarry, along with minor amendments to the permitted quarry layout comprising an extraction area of c.4 ha within an overall application area of c.11.4 ha. The development will include provision of new site infrastructure, including water management system, wheelwash and other ancillaries. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS).
A private dwelling house, proprietary effluent treatment system and percolation area, domestic garage, entrance onto public road and all ancillary site services
Permission for refurbishment of existing stone cottage and construction of a single storey extension to accommodate two additional bedrooms, living, dining, kitchen and utility room. Extend and convert the attic space of the previous extension. Construct a new effluent treatment system, percolation area, surface water soakaway, all associated works and ancillary services
The brief summarizes the pattern across all 193 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2347The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief