Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 197 decisions within 5 km, 2 exact-site or onsite candidate records, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
3 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 matched14 structured nearby appeal records.
14 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a single storey dwelling, single storey garage, new domestic entrance from an existing agricultural laneway, septic tank & percolation area, bored well and all associated site works
Permission is sought for construction of a new dwelling with; packaged wastewater treatment system and polishing filter; bored well; splayed entrance and all associated site works.
Permission to demolish an existing house ruins and construct a single storey dwelling, appropriate waste water treatment system, proposed bored well, new entrance, conversion / change of use of existing agricultural outhouse to a domestic storage shed and all ancillary site works and landscaping
A 10 Year Planning Permission for a solar farm with a total area of circa 192 hectares. The solar farm will consist of solar panels on ground mounted frames, 30 no. single storey electrical inverter/transformer stations, 4 no. single storey spare parts containers, 4 no. Ring Main Units, 8 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 2 no. stream deck crossings and 1 no. horizontal directional drill, temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 4 no. entrances from the L3051, L3052 and L3050. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application
Permission for an extension to existing dwelling house, along with a pergola and ancillary services
The construction of a single storey dwelling house, formation of a new vehicular entrance and driveway, bored well, wastewater treatment system and polishing filter and all associated site works. A Natura Impact statement has been prepared in respect of the planning application.
The brief summarizes the pattern across all 197 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460005The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief