Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 538 decisions within 5 km, 1 exact-site or onsite candidate record, and 23 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Monaghan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Monaghan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Monaghan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
23 structured nearby appeal records.
23 matchedNo current-dated citation is loaded for Monaghan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission for a new daycare centre for the Alzheimer Society of Ireland, detached garage, new vehicular entrance and all associated site civil works, Significant Further Information submitted relates to, Revised Drawings, Stage 1 & 2 Road Safety Audit
Permission for the development will consist of: change of use of existing ground floor retail unit to a pizza restaurant with ancillary takeaway and coffee sales, including minor internal alterations and installation of an odour extraction system to the side, and all associated works.
Permission to consist of:- Grounded mounted Photovoltaic Solar Panels with a maximum square meterage of 347 m2 distributed over a grass area on-site with associated ancillary works at Monaghan Waste Water Treatment Plant
Permission for a development consisting of change of use from commercial to domestic together with alterations and extensions to the existing building within an Architectural Conservation Area to include the following: (i) demolish existing gable wall & rebuild together with ridge height increase, (ii) construct a single-storey rear extension, (iii) demolish existing out-building & erect a new single-storey storage/outbuilding (iv) all ancillary internal & external façade alterations (v) new gate to exisiting alleyway (vi) all associated site works.
Development consisting of; 1. Permission for the erection of 6 no. new 18m high columns with 8 floodlights per column to existing training pitch 2. Permission to retain & complete access walking path to training pitch 3. Retention permission for as installed 4 no. 18m high columns with 8 floodlights to the juvenile playing pitch and all associated site development works
Prmission for The Erection of Advertising Signage and All Associated Work At 8 Old Cross Square, Co. Monaghan.
The brief summarizes the pattern across all 538 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460070The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief