Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 77 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Sligo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Sligo County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Sligo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedNo current-dated citation is loaded for Sligo County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
(1) construction of 4 no. 1 Bed apartments, 10 no. 2 Bed semi-detached dwelling houses, 18 no. 3 Bed semi-detached dwelling houses, 16 no. 4 Bed semi-detached dwelling houses and 14 no. 4 Bed detached dwelling houses (62 no. total units (58 houses, 4 apartments)); (2) the extension and connection of the existing access road and estate services and (3) to carry out ancillary site works
(1) construction of new entrance, boundary wall and car parking area; (2) construction of an all-weather pitch with associated fencing, ball stop netting and running/cycling track; (3) construction of playground and walking track; (4) construction of a changing facility; (5) connection to existing services and (6) carrying out of ancillary site works including passive lighting and landscaping
Development consisting of proposed development of lands consisting of 0.8853 hectares as 'Easkey Glamping Village' to consist of the following elements: (i) Works to the front roadside boundary to enable safe access and suitable sightlines, (ii) Amenities building consisting of a reception area, communal outdoor and indoor kitchen, dining, laundry room, bathrooms & bin store (Total area of 223.60 m2), (iii) Communal Area with Firepit, BBQ, outdoor seating and play area, (iv) 3no. storey and half Glamping Barns (21sqm. Each x 4.1m high), (v) 7no. Glamping Pods (21sqm. Each x 3.1m high), (vi) 2no. 2-person Bell tents (3m Dia, height 2.1m) (vii) 2no. 4-person Bell tents (4m Dia, height 2.5m), (vii) 7no. Pitch tents, (ix) Proposed landscaping works to the site to extend existing access road from R297, (x) Proposed car park, (xi) Proposed 5m wide planting for screening and privacy to the east of the site, (xii) Connection to all existing services and carry out all ancillary site works
To carry out repair and renovation work to a protected structure (RPS No. 4) as follows; 1) Demolition of existing rear non original extension. 2) New windows to be added to the rear wall on the ground floor and first floor. 3) Replace existing pvc windows with timber sash windows to replicate original design. 4) Maintenance and repairs to existing fabric and finishes. 5) Internal works to existing structure. 6) Widen existing entrance at the north-east boundary to accommodate parking. 7) Create a new entrance for off-street parking. 8) All ancillary site works
Development consisting of the installation of 116 sq.metres of temporary prefabricated accommodation together with all associated site works and connection to existing services and utilities. The accommodation includes 2 no. single storey classrooms each with floor area of 58 sqm. Part of the existing school contains a protected structure; Sligo record of protected structures 2017-2023 register no. 87 and national inventory of architectural heritage register no. 32306013.
For development consisting of the construction of a dwelling house, domestic garage and connect to public utilities, together with all associated site works
The brief summarizes the pattern across all 77 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460114The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief