Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 80 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Westmeath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Westmeath County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Westmeath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedNo current-dated citation is loaded for Westmeath County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
RETENTION permission for development which consists of an extension to the existing dwelling house to form a link with an outbuilding. and incorporate the outbuilding to form part of the principal dwellinghouse: comprising: living room, bathroom, hall/library, master bedroom, entry hall, dining room, kitchen, utility room, hall; Alterations to the elevations of the outbuilding to insert windows and doors. Retention permission for the use of a second outbuilding to form 2 no. self-catering units, Unit 1 comprising: bedroom-, bathroom, office, kitchen/living, sitting room; Unit 2 comprising: bedroom, ensuite wc, storage, kitchen/living room; Alterations to the elevations of the outbuilding to insert windows and doors and all ancillary works
Construction of a dwelling house, detached garage with treatment system & percolation area with all ancillary site works.
Change of use of existing stables to 5 No. self-catering holiday accommodation. The development will consist of alterations to the existing interior and exterior of the building including a new roof type and stairs at rear. Permission is also sought to connect into a new septic tank and percolation area and new entrance onto public road while closing the existing one and all associated site works
Construction of an extension at the side of my self-catering holiday accommodation building to include on the ground floor kitchen, dining, living area, bathroom, store and office with stairs and on the first floor 3 bedrooms with bathroom, corridor and 6 velux windows with all ancillary site works
Of existing sheep shed and permission for construction of single storey extension to existing house and minor changes to existing floor plan and all ancillary site works
Construction of a dwelling house & detached garage with septic tank & percolation area with all ancillary site works.
The brief summarizes the pattern across all 80 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460143The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief