Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 284 decisions within 5 km, 1 exact-site or onsite candidate record, and 15 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Cavan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Cavan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Cavan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
15 structured nearby appeal records.
15 matchedNo current-dated citation is loaded for Cavan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For the development, which consists of and will consist of variations to previous grant of permission ref. 16/513 and includes the following: RETENTION permission for: (1) To retain as constructed single storey domestic garage and its use as a detached family flat apartment including its internal walls and layout. (2) The revised position on site, adjacent to the family dwelling house. (3) All ancillary site works. Planning PERMISSION for: (1) To complete the external rendered plaster finish to the building. (2) To provided wheelchair ramp and access at the side of the apartment. (3)To fit solar PV panels to the roof. (4) Complete all external ground and ancillary site works. SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED
Construct new entrance onto the R194 with the removal of section of existing stone wall along roadside boundary and reuse of salvaged stone for reconstruction of new entrance and ancillary site works
To (A) Construct ESB & Bin Store, and (B) RETAIN 2 no. windows and revised elevations to Block B
For single storey extension to rear and garage conversion to side
For the construction of a two storey 4 bedroom pitched roof dwelling with an attic conversion within the side garden of the existing house. The vehicular entrance of the public road is as existing. Connection to all public services and all necessary ancillary site development works to facilitate this development
For extension and alterations to north-east of existing dwelling, to include: (i) At ground floor: extension to existing kitchen/dining/living area, and front entrance area. (ii) At first floor, 2 no. ensuite bedrooms with walk-in wardrobe. (iii) With changes and additions to windows and doors. (iv) With proposed new entrance and domestic garage. (v) With connection to existing services and all associated site works
The brief summarizes the pattern across all 284 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460219The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief