Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 267 decisions within 5 km, 3 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Offaly County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Offaly County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Offaly County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedNo current-dated citation is loaded for Offaly County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Construction of a new six-bay, contemporary style lightweight, single-storey building on the site of the existing club, which is now housed in two converted shipping containers. The new clubhouse will consist of a boardroom, a kitchenette, boat storage, gear storage, changing rooms and toilet facilities. The existing previously granted containers will remain on site to be used as additional storage. The additional extra container onsite will be removed. Modification to existing security fencing, to extend down to the new entrance. Close the existing entrance once construction work is completed. Connection to exiting to public sewer and all other associated site works
(A) ONE NUMBER NEW 45FT CONTAINER CONVERTED FOR THE STORAGE OF CANOES (B) ONE NUMBER NEW 40FT CONTAINER CONVERTED FOR THE USE OF CHANGING ROOMS (C) TWO NUMBER NEW DRY CHEMICAL PORTABLE WATER CLOSETS (D) CONSTRUCTION OF NEW SECURITY FENCING SURROUNDING THE SITE AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
A SINGLE STOREY DETACHED GARAGE/FUEL STORE AND GYM ROOM TO THE SIDE OF THE EXISTING DWELLING HOUSE
48M2 SINGLE STOREY EXTENSION TO THE REAR OF EXISTING DWELLING AND ALL ASSOCIATED WORKS ON A SITE 641M2
(A) ONE NUMBER NEW 40FT CONTAINER CONVERTED FOR THE STORAGE OF MACHINERY (B) ONE NUMBER NEW 40FT CONTAINER CONVERTED FOR THE USE OF (i) KITCHEN (ii) MEETING ROOM & (iii) TWO NUMBER TOILETS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF SINGLE STOREY (27.5M2) FLAT ROOF EXTENSION TO FRONT OF EXISTING GARAGE AT SIDE OF DWELLING
The brief summarizes the pattern across all 267 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460273The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief