Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 200 decisions within 5 km, 2 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission to construct a housing development consisting of a total of 22 dwellinghouses comprising of 20 no. two storey semi-detached dwellinghouses and 2 no. single storey semi-detached dwellinghouses, new site entrance onto existing public road, connection to existing public sewer and all ancillary site works, Significant Further Information received relates to submitted, Drawings, Construction Demolition Report, Archaeologist Excavation Strategy, Lighting Design Report, Concept Statement, Road Safety Audit & a water protection plan
Permission for development consisting of an all weather walking track and associated fencing and artificial lighting and alterations to existing site infrastructure as follow; alterations to existing canopy over spectator stand to south eastern side of playing pitches, relocation and extension of existing ball stop nets to the north eastern side of playing pitches, new 1.8mhigh boundary walling/fencing where indicated, covered bicycle shelter, alterations to existing vehicular entrance to include for new removable bollards to vehicular entrance, all associated site works including surface repair works, pedestrian crossings, walkway non slip markings, site signage, etc.
Permission for a development consisting of a new synthetic 3G training pitch, new boundary fences and netting, new floodlighting and all associated site works to the north western side of the existing playing pitches and club facilities and retention of raised ground levels to the same north western area of the site
Permission to erect a detached two storey dwelling house adjacent to existing semi detached dwelling houses connect to existing pumped sewer and exit on to public road by existing entrance, Significant further information relates to, Amended site layout plan letter from Sherry Fitzgerald,
Permission to erect a detached two storey dwelling house adjacent to existing semi-detached dwelling houses, connect to existing pumped sewer and exit on to public road by existing entrance, Significant Further Information received relates to submitted amended site layout map, dwelling house plans, Sherry & Fitzgerald report & legal agreement
Permission for a proposed development consisting of • A single storey shop/retail building with three individual shop/retail units • Re-alignment and demarcation of existing vehicular entrance/exit to the site from the main N54 public road • New car parking and access roads and all associated site works including raised levels for new footpaths and landscaping and new 5m high street lighting to carpark area including bin/waste storage area. • All surface water sewers including new underground petrol bypass separator, including underground soakaways and new foul sewers including decommissioning of existing foul wastewater connection to public sewer and provision of new connection to Public Foul and Public Surface water sewers outside of the site boundary. • Site Boundary alterations including new 1.8m high timber fence to the south western side of the site adjacent to existing dwellinghouse site and new 1.2m high timber palisade fence to the western boundary along green open space and new raised walled planter to the northern (rear) boundary along Mulladuff Housing Estate access road • Provision of new link concrete footpath connecting to existing public footpath • All advertisement signage to buildings • Relocation of existing street furniture from the eastern side of vehicular entrance to the west side of vehicular entrance along the main street. Significant Further Information received relates to a Traffic and Transport Impact Assessment, Road Safety Audit, revised Site Plan Layout and revised Sight Visibility Splay, and Lighting Design Report.
The brief summarizes the pattern across all 200 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460307The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief