Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 226 decisions within 5 km, 3 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct (I) Cubicle shed with slatted tanks and all associated site works
Permission to construct (I) Milking parlour building incorporating dairy, plant, storage, Milk tank, Meal Bin, Rain Water storage tanks, holding yard with crush/ drafting yard, underground effluent tank with flow channel and all associated site works
To construct a two storey, four-bedroom dwelling house, a detached garage, a new site entrance, a packaged waste water treatment system and polishing filter, a bored well and all associated site works
Domestic garage/store and all associated site works
Planning permission for the demolition of existing structures on site and the construction of a new 2 storey dwelling, site entrance, treatment system and all ancillary site works.
Minor internal alterations and to construct a one and a half storey extension linking their existing dwelling and outbuilding and to install a new patent wastewater treatment system and percolation area and associated site works. Ballynasilloge Tower is a Protected Structure.
The brief summarizes the pattern across all 226 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460380The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief