Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 832 decisions within 5 km, 2 exact-site or onsite candidate records, and 56 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Westmeath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Westmeath County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Westmeath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
56 structured nearby appeal records.
56 matchedNo current-dated citation is loaded for Westmeath County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Amend the single storey rear extension as was granted under pl 24/60503 and all associated site works
Demolition of existing single storey side projection and rear conservatory and construct a new two storey side extension with single storey projection to front and single storey rear extension to our existing dwelling house and all associated site works
(a) To construct a split level, four bedroom dwelling, (b) to construct a new domestic garage, (c) to construct a new site entrance and (d) all associated site works
Retention permission of an existing front porch to an existing dwelling and the conversion of a detached garage into utility space and toilet; Planning permission for the construction of single-storey extensions to the side and rear of an existing private dwelling to join the existing utility, the conversion of the utility into an additional bedroom, and all ancillary site works
Construction of an extension to the existing dwelling and minor elevational changes to the existing façade of the dwelling
Construction of a part 7 and part 9-storey office building providing office space, meeting room, staff welfare, reception, service areas and all ancillary site development works. The proposed development includes (1) demolition of existing ESB substation kiosk and construction of new substation at eastern end of site; (2) construction of office building (10,137 square meters) comprising Block A (7 storeys) and Block B (9 storeys) with interconnecting link bridge between first and sixth floor levels and outdoor terrace at sixth floor in Block A and eight floor in Block B; (3) construction of 3 storey parking deck; (4) ancillary site development works including new entrances and internal access road, car and bicycle parking, water/wastewater services, surface water drainage, hard and soft landscaping, signage, rooftop plant and photovoltaic panels and all other site development works. The proposed development will be accessed from the Brawny Road.
The brief summarizes the pattern across all 832 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460503The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief