Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 273 decisions within 5 km, 5 exact-site or onsite candidate records, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For construction of (i) Suckler shed extension (ii) Livestock underpass with effluent tank (iii) Sheep shed with underground slatted tanks, Wash & boot area, Medicine store, toilet, office and training room and all associated site works. SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED - NIS
Construct the following: (1) LV Switch Room & Electrical Substation to replace existing Switch room/substation (Drumcrow) (2) New machinery shelter (Elteen) together with all ancillary and associated site development works (protected structure)
For roof over existing Silage Pit together with all ancillary and associated site development works at Ballyhaise Agricultural College (Protected Structure)
For a new machinery shelter together with an extension to an existing machinery shelter and all ancillary and associated site development works at Ballyhaise Agricultural College (Protected Structure)
To erect an 18m high monopole telecommunications support structure together with antennas, dishes and ancillary works and remove the existing no. 2 timber commumications poles
For demolition of existing garage and construction of 3 storey split level building consisting of 8 No. Units (with 4 no. 1 bed units & 4 no. 2 bed duplex units), connection to existing public services and all ancillary works. Significant further information and revised plans have been submitted.
The brief summarizes the pattern across all 273 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460526The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief