Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 104 decisions within 5 km, 4 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for: 1) retention of existing caravan on site for 18 months from date of grant of planning permission, 2) retention of existing agricultural structures (stables and attached storage building) and detached outhouse for use ancillary to the house, 3) upgrading of existing septic tank to a proprietary tertiary wastewater treatment system, 4) temporary connection of the caravan to the upgraded wastewater treatment system and connection of the renovated dwelling to the upgraded wastewater treatment system, at which time the caravan will be disconnected, 5) retention of and modifications to, the existing rear and side extension to existing dwelling house, including provision of a pitched roof to the side extension to replace the existing flat roof and 6) all ancillary works at
Retention Permission for the alterations to existing dwelling house (demolition of chimney) carried out as part of development granted under Planning Permission PD/25/60042 at
To retain and complete extensions and garage all as per drawing documentation submitted together with all ancillary site works and services at
Permission for revised elevations to the development previously granted under Planning Reference PD/24/60595, together with all associated site development and ancillary works at
Permission for development consisting of: the proposed alteration to an existing dwelling house including the changes to elevations, internal layout and removal of rear annex at
Permission to retain existing garage / store / turf shed and all associated site works at
The brief summarizes the pattern across all 104 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560042The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief