Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 155 decisions within 5 km, 2 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a bungalow type dwelling house, new entrance, boundary walls, piers and fencing, proprietary wastewater treatment unit and percolation area and all ancillary site works
For the erection of a single-storey extension and patio area to the back of the existing detached dwelling and associated renovations
To construct a single storey dwelling house, alterations to existing entrance, boundary walls, piers and fencing, proprietary wastewater treatment unit and percolation area, change of use of existing cottage to storage, decommissioning of existing septic tank, retention of existing garage and all ancillary site works
Erect fully serviced two storey clubhouse containing dressing rooms, showers, toilets, meeting rooms, gym, store and incorporating spectator stands, new entrance, carparking, connection to group water scheme and connect to public sewer, permission also sought to form 2 no. playing fields / walking track and erect associated floodlighting with all ancillary works
EXTENSION OF DURATION OF Planning Reg. No. 17/535; to erect fully serviced two storey clubhouse containing dressing rooms, showers, toilets, meeting rooms, gym, store and incorporating spectator stands, new entrance, carparking, connection to group water scheme and connect to public sewer, PERMISSION also sought to form 2 no. playing fields/walking track and erect associated floodlighting with all ancillary works
For (1) RETENTION of existing temporary changing rooms, toilets & shower rooms, shop & store (2) RETENTION of existing sewerage treatment system and wastewater connection to public sewer (3) PERMISSION erect new spectator stand & 2 no. dugouts and all ancillary site works
The brief summarizes the pattern across all 155 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560106The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief