Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 86 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for development which will consist of the following works 1. Construct 8 No. Glamping pods, 2. Carparking, 3. Reception/Games room, 4. New appropriately sized Waste Water Treatment system, 5. Upgrade existing entrance onto the public road, together with all associated site works at
Permission for (1) the construction of a four-bay, part slatted shed, with a straw bedded area, (2) the demolition of an existing cubicle shed and Retention Permission for: (1) a 3 bay creep shed with a crush (2) a 2 bay roofed dungstead (3) a 4 bay machinery storage shed (4) a 4 bay general storage shed together with all associated site works at
For (a) Demolition of existing single storey kitchen and bathroom and construction of an extension to rear of existing dwelling house and (b) Revision to site boundaries from that permitted under Grant of Planning PD07/2005 with associated site development works at
Permission for the removal of various extensions to the dwelling, removal of flat roofs added at first floor level, the replacement of a flat roof with a pitched roof, the refurbishment and amalgamation for use as part of the extension/house of the existing barn building, the provision of a new single storey extension to the side and back of the existing house, provision of an extension at first floor level, the de-commissioning of the existing septic tank, and the provision of a propriety sewage treatment system, and all ancillary and associated works at
For development which will consist of the construction of an indoor horse training arena with balcony at one end, a horse walker, an outdoor horse training arena and ancillary floodlighting, change of use of an old two storey coachouse from farm buildings to living accommodation including refurbishment of the building and the provision of a packaged waste-water treatment system and polishing filter, the demolition of cattle cubicle sheds and underground cubicle tanks and all associated and ancillary site works at
Permission for conservation and renovation work to Protected Structure RPS: 01000302 to include reinstatement of roof with addition of one roof light, provision of new rainwater goods, new windows and doors, new floors and internal partition walls, onsite waste water treatment system and all associated works at
The brief summarizes the pattern across all 86 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560277The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief