Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 188 decisions within 5 km, 3 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Monaghan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Monaghan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Monaghan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedNo current-dated citation is loaded for Monaghan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission to erect a 850 kW wind turbine located in the northern area of our existing plant, with a hub height of 65 metres and a blade radius of 26 metres, together with underground ducting connecting to the existing ESB substation and all associated site works. A Natura Impact Assessment (NIS) will be submitted to the Planning Authority in connection with the application described above. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413). Significant further information received relates to submitted revised CEMP, Ornithology report, Revised Natura Impact report, Water framework compliance assessment and Updated planning report.
Permission to erecting a 850kW Wind Turbine, located at the North area of our existing plant; the Wind Turbine will be installed with a hub height of 65 meters and a blade radius of 26 meters, with underground ducting connecting to the existing ESB substation and all associated site works. A Natura Impact Assessment (NIS) will be submitted to the Planning Authority in connection with the application described above, Significant Further Information received relates to submitted, Assessment of landscape & Visual Impact, Proposed Wind Turbine Development Photomontage report, Shadow Flicker Report, Noise Assessment, Veon Ecology Letter, 4 letters of consent from neighbour dwellings, revised site layout plan, revised site location map, revised record map
Permission to construct an MV electricity supply sub station together with all ancillary site works on their site
Permission to construct 2 no. attached agricultural buildings over existing hardened area previously used as a silage base, use existing agricultural entrance together with all ancillary site works
Permission to demolish existing derelict two storey dwellinghouse and ancillary outbuildings and construct a new replacement two storey dwellinghouse and detached domestic garage, install new mechanical effluent treatment system, new mounded percolation area, develop existing domestic entrance together with all ancillary site works
Permission to construct 2 new poultry units together with underground washings tanks, vertical meal bins, use existing agricultural entrance and all ancillary site works within existing farmyard complex. This application relates to a development, which is for the purposes of an activity requiring a Licence under part IV of the Environmental Protection Agency Acts 1994 to 2013. An Environmental Impact Assessment Report (E.I.A.R.) will be submitted with this planning application. Significant further information relates to a revised EIAR and additional technical information. The location of the existing entrance and an ancillary plant room are now to be retained.
The brief summarizes the pattern across all 188 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2560469The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief