Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 534 decisions within 5 km, 8 exact-site or onsite candidate records, and 21 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
21 structured nearby appeal records.
21 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
A) construction of a commercial storage yard; b) retention of associated boundary walls within the curtilage of said yard; c) retention of placement of a portable cabin within the yard; and d.) PERMISSION for future construction of an open roofed structure within the yard
Domestic extension at rear of dwelling and PERMISSION to erect new domestic extension to same dwelling
As-constructed single storey extension to the rear of Friary Ironworks
Existing building for commercial purposes
For pedestrian access gate from site boundary at No 9 Derrylavin Heights onto Bulfin Road, Nenagh
An upgrade the existing Nenagh Wastewater Treatment Plant from its current design Population Equivalent (PE) of 12,000 to a PE plant of 22,000. The wastewater will be treated and discharged via an upgraded outfall pipe into the Nenagh River to the immediate east of the site. The proposed development will comprise of: Proposed construction of: • Dual inlet pumping station • Storm overflow chamber complete with overflow screens • 2 No. storm tanks including storm return pumps and tank cleaning systems • Preliminary Treatment Stream comprising: • Fine Screens complete with screenings handling systems • Grit Removal system complete with fat, oil and grease removal • Grit Handling system and fat, oil and grease storage tank • Sludge Process Stream comprising: • Sludge Import Station complete with ancillary equipment • Waste Activated Sludge Buffer Tank complete with ancillary equipment • Picket Fence Thickeners complete with ancillary equipment • Thickened Sludge Tanks complete with transfer pumps • Sludge Dewatering system complete with outdoor sludge skips • Polymer make-up and dosing plant • Return liquors pumping station • Sequencing Batch Reactor tanks and blowers with distribution chamber • Ferric sulphate dosing plant • Tertiary Treatment Disk Filter and wastewater pumping station • 2 No. Odour Control Units with additional passive odour units • New ESB MV substation complete with outdoor generator and bunded fuel storage tanks • New control panel kiosks • Upgrade of outfall headwall to Nenagh River • Site lighting • Flood defence walls to existing buildings and Flood Compensation Areas • Revised site entrance including layby area and palisade fencing • Flow measurement and sampling chambers Proposed repurposing of existing structures as follows: • Conversion of existing Picket Fence Thickener to a sludge import pumping station. • Conversion of existing Final Settlement Tank to a final effluent buffer tank. • Conversion of existing Final Settlement Tank to a surface water attenuation tank. • Diversion of existing Northern Catchment gravity main to proposed inlet pumping station. • Diversion of existing Southern Catchment rising main to proposed inlet pumping station. Demolition of the following: • Existing (northern and southern) oxidation ditches to be demolished and partially filled in. • Existing Return Activated Sludge lifting wheel arrangement • Existing Waste Activated System pumping station • Existing belt thicken
The brief summarizes the pattern across all 534 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2587The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief