Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 203 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Cavan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Cavan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Cavan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedNo current-dated citation is loaded for Cavan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For 1. Re-Development and reconfiguration of existing dwelling house; 2. Demolition of single storey porch to front and single storey extension to rear of existing dwelling house; 3. Construction of a new single storey porch to front and single storey extension to rear of dwelling house; 4. Replacement of existing roof with a new roof to cover the existing dwelling and proposed extension; 5. Development of roof space to provide bedroom accommodation at first floor level & 5. Associated elevational revisions together with all ancillary site development works
To construct a 24 metre high multi-user lattice tower telecommunications structure, carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound together with associated ground equipment and associated site works including new access track. Significant further information and revised plans have been submitted.
For 1. RETENTION of partially constructed part single storey, part two-storey dwelling house which is revised from that granted Planning Permission under Planning Reference No. 22/279 and 2. PERMISSION to complete the construction of the said dwelling house, relocation of the position of the entrance off existing private laneway to include the provision of entrance piers together with all ancillary site development works
For a two-storey dwelling house, single storey domestic garage, wastewater treatment system and percolation area, access via existing private laneway, entrance piers together with all ancillary site development works
Of change of house type from dormer dwelling (previously granted under 07/717) to two storey dwelling and all ancillary site works
For a two-storey dwelling house, single storey domestic garage, wastewater treatment system and percolation area, vehicular entrance, entrance walls and piers together with all ancillary site development works
The brief summarizes the pattern across all 203 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2660110The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief