Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 79 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a new single storey National Mountain Bike Trail Head Building consisting of a café, bike hire facility, toilets, ancillary spaces and all associated site works, the construction of a new wastewater treatment system and bike wash area. These proposed works if so granted planning permission will replace the previously granted proposed building development (planning reference nr: 17294). A Natura Impact Statement will be submitted to the planning authority with the application.
For development consisting of the construction of a new dwellinghouse, new garage, effluent treatment system, percolation area, formation of a new site entrance and all associated site works
For development consisting of construction of a duo pitched slate roof structure on an existing flat roof store room at the side of dwelling house
Development consisting of the following: (1) Retention permission for conversion of two number farm out buildings to temporary living accommodation. (2) Connection of temporary living accommodation to existing septic tank treatment system. (3) All associated site works and landscaping
Development consisting of the construction of a new dwelling house, new garage, effluent treatment system, percolation area, formation of a new site entrance and all associated site works
For development consisting of the construction of a new foerstry access entrance to an existing mature forestry and all ancillary works
The brief summarizes the pattern across all 79 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360115The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief