Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 331 decisions within 5 km, 1 exact-site or onsite candidate record, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
This development will consist of the importation and recovery through deposition of inert waste and material, namely soil and stones, for the restoration of the existing gravel pit, as well as use of the existing authorised site access and revised internal roadway, wheel bath, and associated civil works for a five year period. The area to be restored by this development is 2.0157 hectares, and the application area is entirely within the area authorised by 6754, QY20 and 1392
To install 30 KW of roof mounted solar panels on existing roof of canopy attached to the shop front (area of solar panels 127.3 sq.m roof area 173 sq.m) and all associated site works
An extension to existing industrial unit and ancillary office accommodation, retention permission for existing dry store, along with concrete yards and all ancillary works
For a Medium Voltage (MV) Substation Buildings and all associated works to facilitate the development
The construction of a detached domestic garage and all associated site works
The construction of 4 No. industrial buildings accessed from the existing industrial park access road, comprising: Unit A (8,283m2) will consist of a single storey industrial unit with an attached two storey building consisting of ancillary toilets, canteen, locker room and offices; Unit B (8,584m2) will consist of a single storey industrial unit with an attached two storey building consisting of ancillary toilets, canteen, locker room and offices; Unit C (3,399m2) will consist of a single storey industrial unit with an attached two storey building consisting of ancillary toilets, canteen, locker room and offices; Unit D (3,594m2) will consist of a single storey industrial unit with ancillary toilets. Other works as part of the development include: new access road continuing from existing industrial park access road to serve the site; connection to existing services; landscaping; boundary treatment; and all associated works to facilitate the development. An Environmental Impact Report and A Natura Impact Statement are submitted with this application.
The brief summarizes the pattern across all 331 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17308The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief