Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 510 decisions within 5 km, 1 exact-site or onsite candidate record, and 39 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
39 structured nearby appeal records.
39 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a four-bedroom single-storey dwelling house and garage, upgrade existing field entrance, connection to public watermain, installation of a tertiary effluent sewage treatment system and percolation area and all necessary site works, landscaping and drainage
1) Demolish three small extensions (28.70sqm) and construction of two single-storey extensions (50.5sqm) and one 2-storey extension (64.60sqm per floor) 2) Upgrade existing two-storey house (48sqm per floor) 3) decommission existing septic tank 4) Provide new proprietary sewerage treatment system with percolation area 5) Include new combined domestic and agriculture entrance 6) New post-and-rail fence with screen planting
Construction of a three-bedroom single storey dwelling (178.0 sqm), boundary fencing, landscaping, new tertiary wastewater treatment system and polishing filter together with all associated site works
Construction of a 3 bedroom storey and a half type dwelling, domestic garage, site entrance, boundary fencing, landscaping, wastewater treatment system with soil polishing filter/percolation area together with all associated site works
Construction of three bedroom single storey dwelling (overall floor area 178m2) together with Tertiary Wastewater Treatment System and polishing filter and all associated site works
Construction of a new house including domestic sewage treatment system together with associated siteworks, landscaping, domestic garage, realignment of front boundary plus site entrance/driveway
The brief summarizes the pattern across all 510 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21448The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief