Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 75 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development consisting of planning permission to retain (1) stone based yard for the storage of building materials (2) entrance used in conjunction with builders yard
Construction of extension to rear of existing dwelling house and connection to existing treatment system, together with all associated site works
Construction of a new slatted shed including dry bed area and all associated site works
Permission and Retention Permission for the following: 1. to refurbish house to include alterations to elevations, 2. to construct new side/rear extension to same and 3. to retain and complete upgraded treatment system and percolation area and carry out all ancillary site development works at
To construct new single storey dwelling, new wastewater treatment system and percolation area, together with all associated site works
To construct a bell mouth entrance onto public road to facilitate access to forestry plantation together with internal access road and turning head and all associated site works at
The brief summarizes the pattern across all 75 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21484The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief