Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 802 decisions within 5 km, 2 exact-site or onsite candidate records, and 99 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
99 structured nearby appeal records.
99 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For a laydown area for equipment and break bulk materials. The works will include earthworks, drainage, concrete paving, retaining walls and landscaping works. A Natura Impact Statement will accompany this application
For a laydown area for equipment and break bulk materials. The works will include earthworks, drainage, concrete and hardcore paving, retaining walls and landscaping works at
For the demolition of an existing gate house/security office at the main entrance to Belview Port and its replacement with a new larger gate house/security office and all associated site works including the provision of temporary security offices and temporary weighbridge, relocation of one existing weighbridge, entrance alterations, drains and services. Also planning permission for the construction of a second security office, two number car parking spaces, barriers and associated site works to control access to the rear entrance to Belview Port
For a 7 year planning permission for a bulk store and associated site works. The store will be used to store port related products such as break bulk, bulk and unitised loads
For (1) (a) Permission for the proposed erection of a Fertiliser Storage unit together with all associated site works, landscaping and ancillary services on site including (b) the removal of the existing septic tank on site, and the proposed installation of a new treatment system on site to cater for foul water from site (c) the removal of the existing attenuation tank on site and the proposed installation of a new attenuation tank on site together with installation of a Bypass Separator with Flume monitoring equipment on the discharge from the surface water drainage on site, and for (2) Permission for Retention of a water storage tank for fire fighting purposes, pump house, storage shed and external storage area for sawdust. An Appropriate Assessment Screening Report forms part of the Planning Application
For a 7 year permission for Bulk Stores and associated site works. The Stores will be used to store part related products such as bulk break, bulk and unitized products. The site works will include two weighbridges, weighbridge office, a new entrance for trucks, entrance gates, earthworks, fencing, relocation of an existing water tank, retaining walls, drainage, paving works and landscaping.
The brief summarizes the pattern across all 802 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22318The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief