Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 8,997 decisions within 5 km, 10 exact-site or onsite candidate records, and 2545 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2545 structured nearby appeal records.
2,545 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Two storey extension and alterations to existing school including all associated site works.
Retention planning permission and planning permission for development at Holy Spirit Junior Primary School, Greenhills, Walkinstown, Dublin12. The development will consist of: (1) Retention of existing single storey prefabricated classroom building including all associated site works. (Planning Reference: SD17A/0184 (2) Planning permission to retain the temporary prefabricated classroom building including all associated site works as granted under planning reference SD17A/0184 for a further period of 5 years.
Extension at first floor level to side above existing garage / utility comprising of 19.5sq.m including extending existing tiled roof; Extend 7sq.m to existing ground floor kitchen extension to rear (Reg. K-829 July 1976); Provide access to attic for additional wc / shower, inline roof lights and playroom; Porch to front 2.5sq.m with lean to tiled roof extending to cover garage door; Widen vehicle entrance to 3.5m to allow for access for 2 off-road parking spaces.
The proposed development will consist of the demolition of the existing side extension, internal alterations to existing ground and first floor levels, the construction of a part single-storey and part two-storey extension to the rear and side of the existing dwelling, alterations to the existing materiality and fenestration details to the existing dwelling, the construction of a new garden studio to accommodate a home office, gym and bathroom, along with alterations to the existing vehicular entrance, all along with associated landscaping, ancillary and site works.
Demolition of single storey converted garage; single storey extension to front; 2 storey extension to side; single storey extension to rear; all associated windows and site works.
First floor Extension over existing converted garage with dormer to rear of newly formed roof & velux to front and all associated site works
The brief summarizes the pattern across all 8,997 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief