10 year permission for the construction of a 115MW Peaker Power Plant in a single storey building with a mezzanine level office and electrical control area. This building has a platform height of 17.52m, 7 shafts with a height of 20.74m and 2 stacks with a height of 25m. The development also includes water and fuel tanks with associated pump houses; 1 building consisting of a compact workshop and warehouse and a security area, with a height of 6.5m; site access and entrance gates; internal roadways and footpaths; security fencing; 6 car parking spaces (1 of these is accessible) and appropriate landscaping all on a site of 1.23 hectare site in the north of Grange Castle Business Park. The total gross floor area of the facility is approx. 3,583sq.m. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
a 1.233 hectare Site Located at Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 2,528 nearby planning records within 5 km where a location match is available.
- Matched source
- SD23A/0079
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
10 year permission for the construction of a 115MW Peaker Power Plant in a single storey building with a mezzanine level office and electrical control area. This building has a platform height of 17.52m, 7 shafts with a height of 20.74m and 2 stacks with a height of 25m. The development also includes water and fuel tanks with associated pump houses; 1 building consisting of a compact workshop and warehouse and a security area, with a height of 6.5m; site access and entrance gates; internal roadways and footpaths; security fencing; 6 car parking spaces (1 of these is accessible) and appropriate landscaping all on a site of 1.23 hectare site in the north of Grange Castle Business Park. The total gross floor area of the facility is approx. 3,583sq.m. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.
Alterations to a previously approved development (Reg. Ref. SD15A/0061 and Reg. Ref. SD16A/0398) which relates to a 10-year permission for the construction of a Peaker Power Plant in a single storey building with a mezzanine level, together with associated plant equipment including water & fuel tanks. The alterations to the previously approved development (Reg. Ref. SD15A/0061 & SD16A/0398) include the following: (i) alterations to the previously approved building within the eastern portion of the site as follows: (a) an increase in the overall footprint of the building to the north-west to include office space, and staff facilities at ground floor level; and to the north-east to include a boiler room at ground floor level; (b) revised roof footprint to the rear of the building, with the roof being lowered to the rear; (c) relocation of stair cores and updates to building elevations, including the introduction of additional glazing; (d) amendments to the external open service yard to the north of the building including the removal of the previously approved transformer rooms, addition of containerised plant and minor alterations to the location of shaft towers; (e) a minor increase in the height (by 600mm) of the screen to the service yard. Alterations to the western portion of the site include; (ii) minor amendments to the positioning of the internal roadway; (iii) amendments to the tank bund area and tank arrangement to the west of the site, and the addition of contained plant and a pump house building; (iv) minor amendment to the location of the approved tanker unloading area; (v) relocation of car parking spaces from the south of the site to the north of the main bund areas, with the exception of the approved accessible parking space; (vi) provision of a gas skid & support structure to the south-west of the site; (vii) provision of an enlarged plant compound to the west of the bund area and relocation of transformers to this compound; (viii) revisions to the positioning and an increase in size of the approved pipe bridge to align with services; (ix) provision of a new bicycle parking shelter comprising 8 no. parking spaces; (x) amendments to soft landscaping to accommodate the revised layout and; (xi) drainage, boundary treatments, site lighting, EV car charging ports; and all associated site development and ancillary works necessary to facilitate the development. The capacity of the plant will be 115MW as approved under Reg. Ref. SD15A/ 0061. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.
Permission to install a standby industrial diesel generator and solar panels. The generator will include a bunded fuel tank to be located within a mesh enclosure. The proposed solar panels will be attached to a steel frame erected over the proposed generator and existing telecoms equipment, (covering an area of approximately 36 sq.m., to a maximum height of 4.6 meters above local ground level.) Works to include all ancillary development works, all located within an existing fenced compound.
Construction of a two storey data centre with three storey central service spine (7,246sq.m) with plant at roof level, that includes a reception area (274.4sq.m), shipping area (264.3sq.m) and three data halls (each 582.5sq.m - total 1,747.5sq.m) plus service spine and ancillary space at ground floor; storage (476sq.m) at mezzanine level above the shipping area; and office (560sq.m), three data halls (each 582.5sq.m - total 1,747.5sq.m) plus service spine and ancillary space at first floor level; and service spine at second floor level only. The new data centre will include plant at roof level; associated support services, 7 standby generators with associated flues (each 17.29m high). The development with include a single storey sub-station (74.5sq.m), transformer 26.8sq.m and bin compound (33sq.m) and will connect to existing Grange Castle infrastructural services the will include a new access road that will provide independent vehicular access to the site off the northern spine road that provides access to the existing data centre granted under SD15A/0034. The development will include ancillary site works as well as fencing, signage, entrance gate, 22 car parking spaces that include 2 disabled car parking spaces, as well as sheltered bicycle parking. The development will also include modifications to the attenuation pond, and to the landscaping previously permitted under SD15A/0034. Temporary permission is also sought for 72 temporary construction worker parking spaces, temporary construction compound and temporary construction access from Grange Castle Business Park lands to the west. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
1 screened bin compound to be relocated to the south-east corner of the site; 2 transformers within individual compounds and adjoining switch room (35.2sq.m) to be located to the east of the permitted data centre to replace screened transformer compound permitted to the south-east of the site; 1 new plantroom (19.8sq.m) and 1 water storage tank to be located to the west of the permitted data centre to replace previously approved fire suppression enclosure and new double gates to replace sliding gates at entrance into the permitted data centre site.
Source match
Matched from public planning record SD23A/0079The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report