Single storey extension to front of 2 storey mid terrace dwelling house to consist of enlargement of existing living area and to have tiled mono-pitched roof with roof light. Extension also to adjoin existing front porch. Permission is also being sought for retention of and alterations to existing front porch. Alterations to consist of replacement of existing tiled hipped roof with tiled apex gable roof, and relocation of existing entrance door to side of porch to front of porch.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
32, Drumcairn Park, Fettercairn, Tallaght, Dublin 24
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 3,083 nearby planning records within 5 km where a location match is available.
- Matched source
- SD16B/0389/EP
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
2 semi-detached, two bedroom two storey type dwellings to the side/rear of dwelling with modification of the existing entrance to provide pedestrian and vehicular access; 4 car spaces; access road; all associated services; landscaping; ancillary site works.
Two storey extension to the side; single storey extension to the side and rear with courtyard; Extension of the existing single storey shed in the back garden for storage and gym area.
Amendment to planning permission Reg. Ref. SD25B/0307W: Construction of a single-storey flat-roof side extension, together with a new relocated side gate providing access to the rear garden.
Construction of a single-storey flat-roof garden room to the rear of the property.
Material alteration to a single school wing consisting of the installation of an external insulation with rendered finish to the junior school wing and the installation of an external biomass boiler unit to the north elevation / creche wing as part of the pathfinder 2022 energy upgrade programme.
The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report