Two storey extension to the rear of the existing semi-detached dwelling with a tiled roof with roof lights, external finishes to match existing, new store to the rear garden, internal alterations and associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
12, Kingswood View, Tallaght, Dublin 24
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 4,670 nearby planning records within 5 km where a location match is available.
- Matched source
- SD17B/0381
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Retention for single storey building to rear garden for home office / playroom use and all associated site works.
2.4m x 2.4m internally illuminated Costa Coffee roundel to southeast elevation; southwest elevation to have 1m high grey aluminium fascia with 0.64m high Costa Coffee internally illuminated individual letters (colour white) above window opening; door to have Costa red 'goal post' frame surround with aluminium weather canopy above; northwest elevation to have grey aluminium fascia with Costa Coffee internally illuminated individual letters (colour white); northeast elevation window opening to have Costa red frame around window opening with 0.64m high Costa coffee internally illuminated letters (colour white) above window opening.
Completion of the development of Block 2 (granted permission under PA Ref. SD17A/0295) subject to: Permission for the change of use of the ground and first floor of the southerly unit (Unit 2) in the permitted Block 2, from retail to coffee shop and their amalgamation into a single operational unit; Retention for amendments to the external facade of entire of Block 2 including signage areas; all amendments are illustrated on the plans lodged with the application.
Permission to change the use of Unit 3 of Block 2, from retail to a medical practice as well as permission for associated signage area and all associated works to complete the development.
The construction of a two storey, mixed use, development consisting of a public house at ground floor level with a gross floor area of 359sqms. The public house includes internal bin storage and other ancillary rooms. The construction of 4 residential apartments (Gross floor area 374sqms) at first floor consisting of 2no. one bed units; 1no. two bed unit; and, 1no. 3 bed unit. All apartments have private space in the form of balconies with a common area at first floor for access to each apartment with access to this common area off the internal entrance lobby; internal, residential, bike storage room and bin storage room at ground floor level. The proposed development includes communal amenity spaces located to the west of the block and at first floor level; parking of 8 spaces including 1 no mobility space, 2 electric vehicle spaces and is accessed via a new vehicle entrance from the Old Belgard Road. New boundary treatments proposed along with a drop off area and wider soft and hard landscaping including a plaza area which ties into the public footpath on the Old Belgard Road; external bike parking areas within these external spaces; and, a connecting footpath to the established local centre to the north. Associated mechanical plant, PV panels at roof level, groundworks, landscaping, drainage including SUDS measures, lighting, engineering and ancillary works necessary to facilitate the development.
The full report covers all 4,670 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record SD17B/0381The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report